Meeting Information | |
---|---|
Status | Completed |
Starts | Jul 15, 2008 at 08:00am |
Ends | Jul 16, 2008 at 5:00pm |
Location | Sheraton Gateway Suites O'Hare Airport |
Purpose & Summary |
A workshop on Cased Pipeline Integrity Assessments was held in Chicago on July 15th & 16th. PHMSA, the National Association of Pipeline Safety Representatives (NAPSR), NACE International and several industry organizations (AGA — American Gas Association, API — American Petroleum Institute, INGAA — Interstate Natural Gas Association of America, and APGA — American Public Gas Association) working through a joint steering committee, sponsored, organized, planned and executed this workshop. The workshop brought together over 160 representatives from State (6) and Federal (8) regulatory agencies, trade associations (5), operators (97), service providers/vendors (34), researchers (12), and Standards Committees (6). The workshop's goals included opening a dialog amongst all relevant stakeholders to identify key challenges facing industry and regulators on assessing carrier piping in casings (particularly in High Consequence Areas), sharing information on current research efforts, and identifying potential solutions involving understanding of current regulations, regulatory changes, revised standards, revised operating practices and/or research practices that can help to meet the challenges. The first day included panel presentations and discussions on the following:
The second day initially was going have break out sessions in the morning to have additional discussion on operator assessment practices, service providers, research options and standards development; however the attendees voted overwhelmingly to have just one session and to have an open dialog between attendees on all of the above issues. This way all of the attendees could hear first hand the dialog and the discussions regarding casings assessment methods and other relevant information. There was then an afternoon panel on long term issues, including discussions on whether or not casings are still needed in some/all applications The workshop was successful in identifying key challenges facing industry and regulators in assessing cased pipelines in order to meet regulatory requirements under the Gas and Liquid integrity management program. PHMSA is in the process of reviewing all of the comments and questions presented at the workshop and will formulate a strategy of going forward. Such a strategy may consist of forming a new working technical committee(s) to investigate some of the options, focused research to determine if there are any additional methods of assessment, or having smaller follow-up meetings with stakeholder groups. Background documents, presentations, and additional supporting materials are present below. A summary report including key challenges identified, potential solutions by stakeholder group, and next steps is still being finalized, but will soon be on the website as well. |
Results | |
Final ReportDay 1
Day 2
|
|
Additional Information | |
For additional information, contact: Max KiebaGeneral Engineer, Program Development
max.kieba @ dot.gov |
|
Files | |
05/20/2008: Supplemental Document 7. "NTSB Report on pipeline
failures Beaumont, KY and Lancaster, KY".
NTSB.PDF (3,203 KB)
[Download/Save...] [File #70]
06/30/2008: Supplemental Document 9: NYSEARCH Public Report on
GWUT Field Testing
NYSEARCH_Public_Report.pdf (204 KB)
[Download/Save...] [File #79]
06/30/2008: Supplemental Document 15. PHMSA White Paper on Guided
Wave
PHMSA_White_Paper_on_Guided_Wave.pdf (195 KB)
[Download/Save...] [File #82]
05/21/2008: Supplemental Document 6: Southwest Research Institute
Study ("Statistical Analysis of External Corrosion Anomaly
Data of Cased Pipe Segments")
SWRI_Final.pdf (427 KB)
[Download/Save...] [File #74]
08/11/2008: 01 - PHMSA
Intro and Background plus AGA, API and NACE perspectives
01_-_PHMSA_Intro_Background_plus_AGA_API_NACE.pdf (772
KB)
[Download/Save...] [File #107]
07/30/2008: 2 - NACE
0502
02_-_0502_PHMSA_Pipeline_Casing_Workshop_NACE_0502_Presentation_rpf_7-7-08.pdf
(632 KB)
[Download/Save...] [File #87]
07/30/2008: 3 - NACE
0200
03_-_0200_PHMSA_Pipeline_Casing_Workshop_NACE_Presentation_Didas.pdf
(387 KB)
[Download/Save...] [File #88]
07/30/2008: 4 - NGA
Merte
04_-_Northeast_Gas_Merte.pdf (3,852 KB)
[Download/Save...] [File #89]
07/30/2008: 5 -
Interstate Operator Spectra
05_-_Interstate_Operator_Spectra_Matocha.pdf (1,215 KB)
[Download/Save...] [File #90]
07/30/2008: 7 - LDC
Ameren Davis
07_-_LDC_Ameren_Davis.pdf (541 KB)
[Download/Save...] [File #91]
07/30/2008: 8 - Other
Technology Laclede
08_-_Other_Technology_Laclede_Meirerotto.pdf (3,274 KB)
[Download/Save...] [File #92]
08/11/2008: 09- Plant
Integrity Jackson
09_-_Plant_Integirty_Jackson_PHMSA_Meeting_Jul_08.pdf
(1,567 KB)
[Download/Save...] [File #108]
07/31/2008: 11.
Combined Impro workshop presentation, 12 questions,
additional white paper and presentation
11_-_Combined_Impro_Presentation_and_Supporting_Material.pdf
(2,149 KB)
[Download/Save...] [File #103]
07/30/2008: 12 -
Profile Technologies Geib
12_-_Profile_Technologies_-_PHMSA_Workshop.pdf (991 KB)
[Download/Save...] [File #93]
07/31/2008: 13 -
Corrpro Rankin
13_-_Corrpro_PHMSA_Casing_Workshop_Presentation_07-11-08.pdf
(74 KB)
[Download/Save...] [File #102]
07/30/2008: 14 - Mears
Eastman
14_-_Mears_Cased_Pipeline_ECDA_Process_for_PHMSA_Workshop-_Ver_3.pdf
(508 KB)
[Download/Save...] [File #94]
07/30/2008: 15 - CC
Tech Lawson
15_-_Cased_Crossings-CC_Technologies.pdf (1,008 KB)
[Download/Save...] [File #95]
08/08/2008: 16 - Rosen,
Brian Parker
16_-_Rosen_071508_Cased_Crossing_Workshop.pdf (1,179
KB)
[Download/Save...] [File #105]
07/31/2008: 17 - Baker
Hughes Brown
17_-_Baker_Hughes_Casing_Reporting_Presentation.pdf (484
KB)
[Download/Save...] [File #101]
07/30/2008: 18 - PRCI
Piazza
18_-_PRCI_CASED_PIPELINE_INTEGRITY_MGMT_WORKSHOP_(final_PHMSA).pdf
(564 KB)
[Download/Save...] [File #96]
07/30/2008: 19a - OTD
19a_-_Casing_Workshop_PHMSA_July_2008_OTD_final.pdf (125
KB)
[Download/Save...] [File #97]
07/30/2008: 19b - GTI
19b_-_ERSOY_2008JUL15_R-D_Panel_Slides_PHMSA_Workshop_Final.pdf
(844 KB)
[Download/Save...] [File #98]
08/08/2008: 20 -
NYSEARCH Dzurko
20_-_NYSEARCHPHMSAcasedpipeworkshoppres71108.pdf (347
KB)
[Download/Save...] [File #106]
07/30/2008: 21 - GTI
NYSEARCH North American Casing Research Program
21_-_Final_Version_PHMSA_Workshop_NACR_Program_Presentation.pdf
(74 KB)
[Download/Save...] [File #99]
07/30/2008: 22 - Long
Term Issues
22_-_Long_Term_issues_all_Haase_Gonzales.pdf (732 KB)
[Download/Save...] [File #100]
09/15/2008: FINAL
SUMMARY REPORT
Casing_Workshop_Summary_Report_FINAL.pdf (187 KB)
[Download/Save...] [File #109]
06/30/2008: Supplemental Document 1: Sub Part O regulation
192_Subpart_O_-_June_30_2008.pdf (165 KB)
[Download/Save...] [File #80]
05/20/2008: Supplemental Document 12: AGA Letter to PHMSA
AGA_Letter_to_PHMSA.PDF (567 KB)
[Download/Save...] [File #64]
06/30/2008: Supplemental Document 14: Background info on GTI
NYSEARCH North American Casing Research Program
GTI_NYSEARCH_NACR.pdf (755 KB)
[Download/Save...] [File #81]
05/21/2008: Supplemental Document 13: PHMSA Response to AGA
PHMSA_Response_to_AGA.PDF (113 KB)
[Download/Save...] [File #75] |