Archived Meetings

Hazardous Liquid Integrity Verification Process (HL IVP)

Presentation Files are available for download below under Results.

The recording of the webcast is available at either link below:

Short Link: http://bit.ly/IVP2015

Long link: https://www.youtube.com/playlist?list=PL4wHDsuQ-uKkD_eBHrG45I7Pz0o7HyImD

This and other recordings from previous workhops are also available on the PHMSA Youtube Channel (playlists): https://www.youtube.com/user/PHMSADOT/playlists

Meeting Information
Status Completed
Starts Aug 27, 2015 at 9:00 AM EDT
Ends Aug 27, 2015 at 4:15 PM EDT
Location Crystal City Marriott at Reagan National Airport and via webcast
Virtual Information

http://bit.ly/IVP2015

Purpose & Summary

The Integrity Verification Process is to confirm the Maximum Operating Pressure (MOP) when pipeline records are not traceable, verifiable, or complete. The Pipeline and Hazardous Materials Safety Administration (PHMSA) held a similar workshop in August 2013 on the Integrity Verification Process for gas transmission pipelines, to help address several mandates in the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 and National Transportation Safety Board recommendations. At this 1-day workshop, PHMSA with present proposal for Integrity Verification Process for hazardous liquid pipelines, and have presentations of perspectives from pipeline operators, state regulatory partners, and the public.

Earlier draft material provided to stakeholders along with comments in response are available via the same public docket that will be used for this workshop (PHMSA-2014-0150) or the direct link... http://www.regulations.gov/#!docketDetail;D=PHMSA-2014-0150

Results

Presentations delivered at the workshop are below. A link to the webcast recording will be provided as soon as possible.

Welcome/Event Introduction
Alan Mayberry, Deputy Associate Administrator for Pipeline Policy & Programs, USDOT/PHMSA
and

Event Moderator: Ken Lee, Director of Pipeline Engineering and Research, USDOT/PHMSA

Integrity Verification Process Perspective: National Transportation Safety Board

Robert Hall, Director, NTSB Office of Railroad, Pipeline and Hazardous Materials Investigations

PHMSA's Approach for the Integrity Verification Process, Summary of Comments Received thus far on docket

Steve Nanney, Senior Engineer, USDOT/PHMSA

NAPSR/State Perspective on the Integrity Verification Process

Joe Subsits, Chief Engineer, Washington Utilities and Transportation Commission

Pipeline Safety Trust Perspective

Carl Weimer, Executive Director, Pipeline Safety Trust

Pipeline Operator Perspectives
  • Jason Smith, Director, Asset Integrity, Magellan Midstream Partners
  • Phillip DePriest, Manager, Integrity, Damage Prevention & Risk, Marathon Pipe Line LLC
  • Jake Haase, Director, Integrity Engineering, Enterprise Products
Additional Information

For more information, contact Max Kieba via phone at 202-493-0595 or email at max.kieba @ dot.gov

Files
 File Type08/31/2015: PHMSA Intro-wrap up slides
2_HL_IVP_PHMSA_Intro-wrap_up_slides.pdf (357 KB)
[Download/Save...] [File #662]
 File Type08/31/2015: Robert Hall-NTSB Slides
3_2015_HLIVP_RJH_presentation.pdf (1,204 KB)
[Download/Save...] [File #663]
 File Type08/31/2015: Steve Nanney Presentation
4_PHMSA_Workshop-_HL-IVP_-_Steve_Nanney_-_08-27-15_-_Final.pdf (1,134 KB)
[Download/Save...] [File #664]
 File Type08/31/2015: Subsits - NAPSR Presentation
5_NAPSR_IVP.pdf (66 KB)
[Download/Save...] [File #665]
 File Type08/31/2015: Carl Weimer Presentation
6_Weimer_HL_IVP_Presentation.pdf (1,554 KB)
[Download/Save...] [File #666]
 File Type08/31/2015: Jason Smith - Magellan Presentation
7_Smith_Magellan_Presentation_-_Hazardous_Liquid_Integrity_Verification_(8-27-15).pdf (245 KB)
[Download/Save...] [File #667]
 File Type08/31/2015: Phillip DePriest - Marathon Presentation
8_DePriest_MPL_IVP_Presentation_Final_Aug-2015.pdf (1,701 KB)
[Download/Save...] [File #668]
 File Type08/31/2015: Jake Haase - Enterprise/PRCI Presentation
9_Jake_Haase_PRCI_IM_1-4_Presentation_8-26-15_FINAL.pdf (384 KB)
[Download/Save...] [File #669]
 File Type08/04/2015: HL IVP Chart Draft 10-31-2014
HL_IVP_Chart-draft_10-31-2014.pdf (426 KB)
[Download/Save...] [File #657]