Meeting Information | |
---|---|
Status | Completed |
Starts | Aug 27, 2015 at 9:00 AM EDT |
Ends | Aug 27, 2015 at 4:15 PM EDT |
Location | Crystal City Marriott at Reagan National Airport and via webcast |
Virtual Information | |
Purpose & Summary |
The Integrity Verification Process is to confirm the Maximum Operating Pressure (MOP) when pipeline records are not traceable, verifiable, or complete. The Pipeline and Hazardous Materials Safety Administration (PHMSA) held a similar workshop in August 2013 on the Integrity Verification Process for gas transmission pipelines, to help address several mandates in the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 and National Transportation Safety Board recommendations. At this 1-day workshop, PHMSA with present proposal for Integrity Verification Process for hazardous liquid pipelines, and have presentations of perspectives from pipeline operators, state regulatory partners, and the public. Earlier draft material provided to stakeholders along with comments in response are available via the same public docket that will be used for this workshop (PHMSA-2014-0150) or the direct link... http://www.regulations.gov/#!docketDetail;D=PHMSA-2014-0150 |
Results | |
Presentations delivered at the workshop are below. A link to the webcast recording will be provided as soon as possible. Welcome/Event IntroductionAlan Mayberry, Deputy Associate Administrator for Pipeline Policy & Programs, USDOT/PHMSA and Event Moderator: Ken Lee, Director of Pipeline Engineering and Research, USDOT/PHMSA Integrity Verification Process Perspective: National Transportation Safety BoardRobert Hall, Director, NTSB Office of Railroad, Pipeline and Hazardous Materials Investigations PHMSA's Approach for the Integrity Verification Process, Summary of Comments Received thus far on docketSteve Nanney, Senior Engineer, USDOT/PHMSA NAPSR/State Perspective on the Integrity Verification ProcessJoe Subsits, Chief Engineer, Washington Utilities and Transportation Commission Pipeline Safety Trust PerspectiveCarl Weimer, Executive Director, Pipeline Safety Trust Pipeline Operator Perspectives
|
|
Additional Information | |
For more information, contact Max Kieba via phone at 202-493-0595 or email at max.kieba @ dot.gov |
|
Files | |
![]()
2_HL_IVP_PHMSA_Intro-wrap_up_slides.pdf (357 KB)
[Download/Save...] [File #662] ![]()
3_2015_HLIVP_RJH_presentation.pdf (1,204 KB)
[Download/Save...] [File #663] ![]()
4_PHMSA_Workshop-_HL-IVP_-_Steve_Nanney_-_08-27-15_-_Final.pdf
(1,134 KB)
[Download/Save...] [File #664] ![]()
6_Weimer_HL_IVP_Presentation.pdf (1,554 KB)
[Download/Save...] [File #666] ![]()
7_Smith_Magellan_Presentation_-_Hazardous_Liquid_Integrity_Verification_(8-27-15).pdf
(245 KB)
[Download/Save...] [File #667] ![]()
8_DePriest_MPL_IVP_Presentation_Final_Aug-2015.pdf (1,701
KB)
[Download/Save...] [File #668] ![]()
9_Jake_Haase_PRCI_IM_1-4_Presentation_8-26-15_FINAL.pdf
(384 KB)
[Download/Save...] [File #669] ![]()
HL_IVP_Chart-draft_10-31-2014.pdf (426 KB)
[Download/Save...] [File #657] |